Philippine Construction and Solar Corporation
Maximum Power Generation.
Proven Climate Resistance.
Exceptional Durability.
Bayswater Talisay
June 26, 2025

Aldela Private Resort

Aldela Private Resort required a reliable and cost-efficient energy solution to support daily operations, including guest accommodations, lighting, and water systems. The goal was to reduce dependence on grid power while ensuring uninterrupted service during peak usage and outages.

~40–50%
daytime energy offset

System Configuration

  • System Size: 82 kWp grid-tied solar system

  • Solar Modules: 610W bifacial modules

  • Inverters: Dual 40 kW three-phase string inverters

  • Estimated Annual Generation: ~110,000–120,000 kWh

  • System Type: Net-metering compliant grid-tied

Commercial Solar Power System Deployment

The Challenge
  • Consistent daytime energy demand

  • Rising electricity costs

  • Need for compliant, scalable infrastructure

The Solution

PCSC implemented a grid-tied commercial solar system, engineered to maximize rooftop capacity and optimize daytime energy offset.

Key Features
  • High-efficiency solar modules

  • Single/three-phase system configuration

  • Grid-compliant installation

  • Long-term performance design

Results
  • Significant daytime grid offset

  • Improved energy cost predictability

  • Reduced long-term operational expenses

  • Infrastructure prepared for future energy expansion